{"id":5384,"date":"2025-09-10T12:48:54","date_gmt":"2025-09-10T11:48:54","guid":{"rendered":"https:\/\/ferrissteel.com\/?post_type=project&#038;p=5384"},"modified":"2026-03-12T18:35:46","modified_gmt":"2026-03-12T17:35:46","slug":"yara-carbon-capture-and-storage-project","status":"publish","type":"project","link":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/","title":{"rendered":"Yara Carbon Capture and Storage project"},"content":{"rendered":"<section  class=\"block text-image block--text-image block--no-spacing-bottom block--double-spacing background-white\">\n        <div class=\"container\">\n            <div class=\"row\">\n                \n                <div class=\"col-xl-5  offset-xl-1 \">\n                    <div class=\"text-image__content h-100\">\n                        <div class=\"mt-auto\">\n                                                            <div data-aos=\"fade-right\">\n                                    <h2 class=\"wp-block-text-image d-none d-md-block\" >1,000 tonnes of steel for Yara\u2019s CCS project<\/h2>\n    <h2 class=\"wp-block-text-image d-block d-md-none\" >1,000 tonnes of steel for Yara\u2019s CCS project<\/h2>\n                                <\/div>\n                                                                                    <div class=\"content mt-3 mt-sm-5 mt-lg-0\" data-aos=\"fade-right\">\n                                <p>&nbsp;<\/p>\n<p>At the Yara Sluiskil site, a completely new facility is being built for the Carbon Capture and Storage (CCS) project. This project is an important step in Yara\u2019s sustainability ambitions and makes a significant contribution to achieving climate targets. Over a period of 15 years, Yara will prevent 12 million tonnes of CO\u2082 emissions thanks to this project.<\/p>\n<p>&nbsp;<\/p>\n<p>Ferris is responsible for the realization of all steel structures within this project.<\/p>\n\n                            <\/div>\n                        <\/div>\n                                            <\/div>\n                <\/div>\n\n                \n                <div class=\"col-xl-6  order-first    mt-5 mt-xl-0\" data-aos=\"fade\">\n                                            <figure\n        class=\"image h-100\"\n        \n    >\n        <img decoding=\"async\"\n            class=\"image--center\"\n            src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Header-Yara-CCS-2000px-1-kopie.webp\"\n            alt=\"Header foto Yara project Carbon capture and storage (CCS)\"\n            loading=\"lazy\"\n        \/>\n        \n    <\/figure>\n                                    <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<section  class=\"block text block--text block--double-spacing background-white\">\n        <div class=\"container\">\n            <div class=\"row justify-content-center\">\n                <div class=\"col-lg-8 col-xl-6\">\n                    <h2 class=\"mb-3 d-none d-md-block\" >Engineering to assembling<\/h2>\n    <h2 class=\"mb-3 d-block d-md-none\" >Engineering to assembling<\/h2>\n                    <p>Designing, producing and assembling: Ferris takes care of the entire process, from engineering to installation. In total, the CCS project includes more than 1,000 tonnes of steel structures.<\/p>\n<p>&nbsp;<\/p>\n<p>Commissioned by Yara, Ferris is working on the Inside Battery Limits (ISBL) section of the plant. This includes, among other things, modifications to the jetty gallery and the construction of piperacks connecting the jetty to the new machine hall.<\/p>\n<p>&nbsp;<\/p>\n<p>At the same time, Ferris is also carrying out the Outside Battery Limits (OSBL) work on behalf of ROB. This part includes new equipment structures, platforms on storage tanks and the realization of the machine hall.<\/p>\n\n                                    <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n\n<section  class=\"block text-image block--text-image block--double-spacing background-white\">\n        <div class=\"container\">\n            <div class=\"row\">\n                \n                <div class=\"col-xl-5 \">\n                    <div class=\"text-image__content h-100\">\n                        <div class=\"mt-auto\">\n                                                            <div data-aos=\"fade-right\">\n                                    <h2 class=\"wp-block-text-image d-none d-md-block\" >Piperacks and jetty gallery<\/h2>\n    <h2 class=\"wp-block-text-image d-block d-md-none\" >Piperacks and jetty gallery<\/h2>\n                                <\/div>\n                                                                                    <div class=\"content mt-3 mt-sm-5 mt-lg-0\" data-aos=\"fade-right\">\n                                <p>At the beginning of 2025, the first piperacks and columns were installed. By now, a total of 400 meters of piperacks has been erected. These structures were fully preassembled \u2014 including piping \u2014 in a separate lay-down area. From there, the complete sections were transported and installed in a single operation.<\/p>\n<p>&nbsp;<\/p>\n<p>The piperacks connect the seven large storage tanks with the jetty gallery, where liquid CO\u2082 will soon be transferred for transport by ship to Norway.<\/p>\n<p>&nbsp;<\/p>\n<p>To enable this, the steel structure of the existing jetty gallery was significantly modified. A new pipe bridge was added to the jetty gallery, along with a platform for the loading arms.<\/p>\n\n                            <\/div>\n                        <\/div>\n                                            <\/div>\n                <\/div>\n\n                \n                <div class=\"col-xl-6   offset-xl-1   d-flex justify-content-center  mt-5 mt-xl-0\" data-aos=\"fade\">\n                                            <div class=\"swiper-container gallery-swiper\">\n                            <div class=\"swiper-navigation d-flex justify-content-between\">\n                                <div class=\"gallery-swiper-controls__prev swiper-navigation--prev hover-button\">\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                <\/div>\n                                <div class=\"gallery-swiper-controls__next swiper-navigation--next hover-button\">\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                <\/div>\n                            <\/div>\n                            <div class=\"swiper-wrapper\">\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara-CCS-Ferris_Structural-Steel-5.jpg\" alt=\"Yara-CCS-Ferris_Structural-Steel-5\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara-CCS-Ferris_Structural-Steel-6.jpg\" alt=\"Yara-CCS-Ferris_Structural-Steel-6\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara_CCS-71-kopie.webp\" alt=\"Yara CCS project Ferris Structural Steel - Installation\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara_CCS-29-kopie.webp\" alt=\"Yara CCS project Ferris Structural Steel - Piperacks\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara_CCS-26-kopie.webp\" alt=\"Yara CCS project Ferris Structural Steel - Heavy lifting\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara-CCS-Ferris_Structural-Steel-1.jpg\" alt=\"Yara-CCS-Ferris_Structural-Steel-1\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                            <\/div>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<section  class=\"block text-image block--text-image block--double-spacing background-white\">\n        <div class=\"container\">\n            <div class=\"row\">\n                \n                <div class=\"col-xl-5  offset-xl-1 \">\n                    <div class=\"text-image__content h-100\">\n                        <div class=\"mt-auto\">\n                                                            <div data-aos=\"fade-right\">\n                                    <h2 class=\"wp-block-text-image d-none d-md-block\" >Machine hall<\/h2>\n    <h2 class=\"wp-block-text-image d-block d-md-none\" >Machine hall<\/h2>\n                                <\/div>\n                                                                                    <div class=\"content mt-3 mt-sm-5 mt-lg-0\" data-aos=\"fade-right\">\n                                <p>Since May, Ferris has been working on the construction of the machine hall \u2014 the beating heart of the new facility. Here, CO\u2082 is compressed and liquefied for storage.<\/p>\n<p>&nbsp;<\/p>\n<p>Ferris is responsible not only for the entire steel structure but also for the acoustic cladding and roofing.<\/p>\n<p>&nbsp;<\/p>\n<p>At the same time, Ferris is constructing surrounding structures such as supports, piperacks and the rectification unit. In addition, Ferris installed platforms on top of the seven imposing storage tanks, which together can store 15,000 tonnes of CO\u2082.<\/p>\n\n                            <\/div>\n                        <\/div>\n                                            <\/div>\n                <\/div>\n\n                \n                <div class=\"col-xl-6  order-first    d-flex justify-content-center  mt-5 mt-xl-0\" data-aos=\"fade\">\n                                            <div class=\"swiper-container gallery-swiper\">\n                            <div class=\"swiper-navigation d-flex justify-content-between\">\n                                <div class=\"gallery-swiper-controls__prev swiper-navigation--prev hover-button\">\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                <\/div>\n                                <div class=\"gallery-swiper-controls__next swiper-navigation--next hover-button\">\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                <\/div>\n                            <\/div>\n                            <div class=\"swiper-wrapper\">\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara-CCS-Ferris_Structural-Steel-1.jpg\" alt=\"Yara-CCS-Ferris_Structural-Steel-1\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara-CCS-Ferris_Structural-Steel-3.jpg\" alt=\"Yara-CCS-Ferris_Structural-Steel-3\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara_CCS-12-kopie.webp\" alt=\"\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara_CCS-14-kopie.webp\" alt=\"\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara-CCS-Ferris_Structural-Steel-2.jpg\" alt=\"Yara-CCS-Ferris_Structural-Steel-2\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Yara-CCS-Ferris_Structural-Steel-4.jpg\" alt=\"Yara-CCS-Ferris_Structural-Steel-4\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                            <\/div>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<section  class=\"block text-image block--text-image block--double-spacing background-white\">\n        <div class=\"container\">\n            <div class=\"row\">\n                \n                <div class=\"col-xl-5 \">\n                    <div class=\"text-image__content h-100\">\n                        <div class=\"mt-auto\">\n                                                            <div data-aos=\"fade-right\">\n                                    <h2 class=\"wp-block-text-image d-none d-md-block\" >Engineering<\/h2>\n    <h2 class=\"wp-block-text-image d-block d-md-none\" >Engineering<\/h2>\n                                <\/div>\n                                                                                    <div class=\"content mt-3 mt-sm-5 mt-lg-0\" data-aos=\"fade-right\">\n                                <p>Ferris\u2019 strength in this project lies primarily in the close collaboration between specialists. Engineers, prefab teams and the assembly department have worked closely together from the start. Using live models, colleagues from different departments can contribute to detailed calculations at an early stage \u2014 crucial for an efficient fabrication and assembly process.<\/p>\n<p>&nbsp;<\/p>\n<p>This collaboration extends beyond Ferris itself. Within the Syndus Group, cooperation also plays an important role. Engineers from sister company Konstruktis contribute to detailed calculations. In addition, in 2022 Konstruktis carried out the main structural calculations for the CCS project, both for the steel and concrete structures.<\/p>\n<p>&nbsp;<\/p>\n<p>To seamlessly integrate new structures into an existing and complex environment, Ferris uses advanced 3D scanning technology. With a 3D scanner, the existing situation is recorded with millimetre accuracy and translated into an exact 3D model. This allows new structures to be integrated into the model and potential bottlenecks to be identified early on.<\/p>\n\n                            <\/div>\n                        <\/div>\n                                            <\/div>\n                <\/div>\n\n                \n                <div class=\"col-xl-6   offset-xl-1   d-flex justify-content-center  mt-5 mt-xl-0\" data-aos=\"fade\">\n                                            <div class=\"swiper-container gallery-swiper\">\n                            <div class=\"swiper-navigation d-flex justify-content-between\">\n                                <div class=\"gallery-swiper-controls__prev swiper-navigation--prev hover-button\">\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                <\/div>\n                                <div class=\"gallery-swiper-controls__next swiper-navigation--next hover-button\">\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                    <div class=\"hover-button__item\"><i class=\"icon icon-arrow\"><\/i><\/div>\n                                <\/div>\n                            <\/div>\n                            <div class=\"swiper-wrapper\">\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Geexporteerd-venster-5-kopie.webp\" alt=\"\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                                    <div class=\"swiper-slide\">\n                                                                                    <figure>\n                                                <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/3-kopie.webp\" alt=\"Engineering piperacks Yara Sluiskil - CCS project - Ferris Structural Steel\" class=\"img-fluid\" \/>\n                                            <\/figure>\n                                                                            <\/div>\n                                                            <\/div>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<section  class=\"block text block--text background-white\">\n        <div class=\"container\">\n            <div class=\"row justify-content-center\">\n                <div class=\"col-lg-8 col-xl-6\">\n                    <h2 class=\"mb-3 d-none d-md-block\" >About the Yara CCS project<\/h2>\n    <h2 class=\"mb-3 d-block d-md-none\" >About the Yara CCS project<\/h2>\n                    <p>At the Yara site in Sluiskil, a completely new facility is being built for the capture, storage and transport of CO\u2082 to Norway.<\/p>\n<p>&nbsp;<\/p>\n<p>At the site, CO\u2082 is liquefied and stored in seven large tanks with a combined capacity of 15,000 tonnes, enough to fill two ships. These ships transport the CO\u2082 more than 800 kilometres to \u00d8ygarden in Norway. There, the cargo is unloaded and transported via a 100-kilometre pipeline to an injection point, where the CO\u2082 is safely stored in porous rock 2.6 kilometres beneath the seabed of the North Sea.<\/p>\n<p>&nbsp;<\/p>\n<p>The CCS project in Sluiskil is the first project in the world where captured CO\u2082 is stored across national borders.<\/p>\n\n                                    <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n\n<section  class=\"block featured-projects block--featured-projects block--double-spacing background-dark\">\n        <div class=\"container-fluid\">\n                            <div class=\"row align-items-center\">\n                    <div class=\"col-md-6\">\n                        <h2 class=\"wp-block-featured-projects d-none d-md-block\" >Related projects<\/h2>\n    <h2 class=\"wp-block-featured-projects d-block d-md-none\" >Related projects<\/h2>\n                    <\/div>\n                    <div class=\"col-md-6 text-right\">\n                        <a\n                    href=\"https:\/\/ferrissteel.com\/en\/projects\/\"\n                            target=\"\"\n                class=\"btn btn--primary d-none d-md-inline-block\"\n            >\n        All projects\n        \n    <\/a>\n\n                        <\/div>\n                <\/div>\n                            <div class=\"row\">\n                                                                        <div class=\"col-lg-6\">\n                                <div class=\"block-link block-link--project\">\n    <a href=\"https:\/\/ferrissteel.com\/en\/projects\/steel-structures-for-avr-steam-power-plant\/\" class=\"block-link__link stretched-link\"><\/a>\n    <figure class=\"image block-link__image\">\n        <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2024\/11\/AVR-tijdelijke-stroomcentrale-Ferris-structural-steel.webp\" alt=\"Steel structures for AVR steam power plant\">\n    <\/figure>\n            <div class=\"block-link__label\">\n            Energy\n        <\/div>\n        <div class=\"block-link__content\">\n        <h3 class=\"block-link__content__title\">Steel structures for AVR steam power plant<\/h3>\n    <\/div>\n    <div class=\"block-link__button hover-button primary\">\n        <div class=\"hover-button__item\">\n            <i class=\"icon icon-arrow\"><\/i>\n        <\/div>\n        <div class=\"hover-button__item\">\n            <i class=\"icon icon-arrow\"><\/i>\n        <\/div>\n    <\/div>\n<\/div>\n                            <\/div>\n                                                                                                <div class=\"col-lg-6\">\n                                <div class=\"block-link block-link--project\">\n    <a href=\"https:\/\/ferrissteel.com\/en\/projects\/renovation-of-condensate-plant\/\" class=\"block-link__link stretched-link\"><\/a>\n    <figure class=\"image block-link__image\">\n        <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2024\/11\/Brownfield-project-Ferris-Structural-Steel.webp\" alt=\"Renovation of condensate plant\">\n    <\/figure>\n            <div class=\"block-link__label\">\n            (Petro)chemie\n        <\/div>\n        <div class=\"block-link__content\">\n        <h3 class=\"block-link__content__title\">Renovation of condensate plant<\/h3>\n    <\/div>\n    <div class=\"block-link__button hover-button primary\">\n        <div class=\"hover-button__item\">\n            <i class=\"icon icon-arrow\"><\/i>\n        <\/div>\n        <div class=\"hover-button__item\">\n            <i class=\"icon icon-arrow\"><\/i>\n        <\/div>\n    <\/div>\n<\/div>\n                            <\/div>\n                                                                <div class=\"col-12\">\n                        <a\n                    href=\"https:\/\/ferrissteel.com\/en\/projects\/\"\n                            target=\"\"\n                class=\"btn btn--primary d-md-none d-inline-block mt-3\"\n            >\n        All projects\n        \n    <\/a>\n\n                        <\/div>\n                <\/div>\n        <\/div>\n    <\/section>\n        \n\n<section  class=\"block text-image block--text-image background-white\">\n        <div class=\"container\">\n            <div class=\"row\">\n                \n                <div class=\"col-xl-5  offset-xl-1 \">\n                    <div class=\"text-image__content h-100\">\n                        <div >\n                                                            <div data-aos=\"fade-right\">\n                                    <h2 class=\"wp-block-text-image d-none d-md-block\" >The Ferris approach<\/h2>\n    <h2 class=\"wp-block-text-image d-block d-md-none\" >The Ferris approach<\/h2>\n                                <\/div>\n                                                                                    <div class=\"content mt-3 mt-sm-5 mt-lg-0\" data-aos=\"fade-right\">\n                                <h3>Strong solutions through collaboration<\/h3>\n<p>&nbsp;<\/p>\n<p>By this, we refer to the close collaboration between colleagues, but also to the cooperation between departments, clients and suppliers. At Ferris, we are convinced that we need each other to deliver high-quality custom solutions. We understand that every step in a steel project matters.<\/p>\n<p>&nbsp;<\/p>\n<p>We take a critical look at ourselves and at each other. We never compromise on safety or quality, and we maintain a sharp focus on our commitments. We take responsibility.<\/p>\n<p>&nbsp;<\/p>\n<p>From engineering to production, installation, and service &amp; maintenance \u2014 together we deliver on our promise of rock-solid solutions.<\/p>\n\n                            <\/div>\n                        <\/div>\n                                                    <div class=\"cta-list mt-4 w-100\" data-aos=\"fade-right\">\n                                                                                                            <li>\n                                            <a href=\"https:\/\/ferrissteel.com\/en\/working-method\/project-based-work\/\" target=\"\">\n                                                <span class=\"cta-list__text\">Project-based work<\/span>\n                                            <\/a>\n                                        <\/li>\n                                                                                                                                                <li>\n                                            <a href=\"https:\/\/ferrissteel.com\/en\/working-method\/project-based-work\/engineering\/\" target=\"\">\n                                                <span class=\"cta-list__text\">Engineering<\/span>\n                                            <\/a>\n                                        <\/li>\n                                                                                                                                                <li>\n                                            <a href=\"https:\/\/ferrissteel.com\/en\/working-method\/project-based-work\/manufacturing\/\" target=\"\">\n                                                <span class=\"cta-list__text\">Manufacturing<\/span>\n                                            <\/a>\n                                        <\/li>\n                                                                                                                                                <li>\n                                            <a href=\"https:\/\/ferrissteel.com\/en\/working-method\/project-based-work\/assembly-steel-structures\/\" target=\"\">\n                                                <span class=\"cta-list__text\">Assembly<\/span>\n                                            <\/a>\n                                        <\/li>\n                                                                                                <\/div>\n                                            <\/div>\n                <\/div>\n\n                \n                <div class=\"col-xl-6  order-first    mt-5 mt-xl-0\" data-aos=\"fade\">\n                                            <figure\n        class=\"image h-100\"\n        \n    >\n        <img decoding=\"async\"\n            class=\"image--center\"\n            src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2024\/11\/Syndus-_-Ferris-BASF-6-11-2024-109.jpg\"\n            alt=\"Ferris on-site BASF Antwerpen\"\n            loading=\"lazy\"\n        \/>\n        \n    <\/figure>\n                                    <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n\n<section  class=\"block cta block--cta block--double-spacing background-grey\">\n        <div class=\" container\">\n            <div class=\"row align-items-end\">\n                <div class=\"col-lg-6\">\n                    <div class=\"cta__title d-flex d-lg-none\">\n                        <figure>\n                            <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/themes\/syndus\/public\/images\/fiberstruct_shape_cta.eb5aea.svg\" alt=\"shape\">\n                        <\/figure>\n                        <h2 class=\"wp-block-cta d-none d-md-block\" >Discuss your challenge with our experts<\/h2>\n    <h2 class=\"wp-block-cta d-block d-md-none\" >Discuss your challenge with our experts<\/h2>\n                    <\/div>\n                    <div class=\"team-item-cta\">\n                        <figure class=\"team-item-cta__image image\">\n                            <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2024\/11\/Projectleider-Ferris-Structural-Steel.webp\" alt=\"\">\n                        <\/figure>\n                        <div class=\"team-item-cta__content\">\n                            <div class=\"team-item-cta__content__name\">\n                                \n                            <\/div>\n                            <div class=\"team-item-cta__content__function\">\n                                \n                            <\/div>\n                        <\/div>\n                    <\/div>\n                <\/div>\n                <div class=\"col-lg-6\">\n                    <div class=\"cta__title d-none d-lg-flex\">\n                        <figure>\n                            <img decoding=\"async\" src=\"https:\/\/ferrissteel.com\/wp-content\/themes\/syndus\/public\/images\/fiberstruct_shape_cta.eb5aea.svg\" alt=\"shape\">\n                        <\/figure>\n                        <h2 class=\"wp-block-cta d-none d-md-block\" >Discuss your challenge with our experts<\/h2>\n    <h2 class=\"wp-block-cta d-block d-md-none\" >Discuss your challenge with our experts<\/h2>\n                    <\/div>\n                                                                <a href=\"tel:+31115644600\" class=\"cta__link cta__link--phone\">\n                            +31 115 644 600\n                        <\/a>\n                                                                <a href=\"mailto:info@ferrissteel.com\" class=\"cta__link cta__link--mail\">\n                            info@ferrissteel.com\n                        <\/a>\n                                    <\/div>\n            <\/div>\n        <\/div>\n    <\/section>\n\n","protected":false},"featured_media":5387,"parent":0,"template":"","categories":[48],"class_list":["post-5384","project","type-project","status-publish","has-post-thumbnail","hentry","category-petrochemical"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Yara Carbon Capture and Storage project | 1,000 Ton Steel<\/title>\n<meta name=\"description\" content=\"Ferris engineered, fabricated and installed over 1,000 tonnes of steel structures for Yara\u2019s Carbon Capture and Storage project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Yara Carbon Capture and Storage project | 1,000 Ton Steel\" \/>\n<meta property=\"og:description\" content=\"Ferris engineered, fabricated and installed over 1,000 tonnes of steel structures for Yara\u2019s Carbon Capture and Storage project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferris\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrissteel\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-12T17:35:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Header-Yara-CCS-2000px-1-kopie.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/yara-carbon-capture-and-storage-project\\\/\",\"url\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/yara-carbon-capture-and-storage-project\\\/\",\"name\":\"Yara Carbon Capture and Storage project | 1,000 Ton Steel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/yara-carbon-capture-and-storage-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/yara-carbon-capture-and-storage-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferrissteel.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Header-Yara-CCS-2000px-1-kopie.webp\",\"datePublished\":\"2025-09-10T11:48:54+00:00\",\"dateModified\":\"2026-03-12T17:35:46+00:00\",\"description\":\"Ferris engineered, fabricated and installed over 1,000 tonnes of steel structures for Yara\u2019s Carbon Capture and Storage project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/yara-carbon-capture-and-storage-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/yara-carbon-capture-and-storage-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/yara-carbon-capture-and-storage-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferrissteel.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Header-Yara-CCS-2000px-1-kopie.webp\",\"contentUrl\":\"https:\\\/\\\/ferrissteel.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Header-Yara-CCS-2000px-1-kopie.webp\",\"width\":2000,\"height\":1333,\"caption\":\"Header foto Yara project Carbon capture and storage (CCS)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/yara-carbon-capture-and-storage-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projecten\",\"item\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Yara Carbon Capture and Storage project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/\",\"name\":\"Ferris\",\"description\":\"Structural steel\",\"publisher\":{\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/#organization\",\"name\":\"Ferris\",\"url\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ferrissteel.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Ferris_Logo_DEF.svg\",\"contentUrl\":\"https:\\\/\\\/ferrissteel.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Ferris_Logo_DEF.svg\",\"width\":1,\"height\":1,\"caption\":\"Ferris\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrissteel.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ferrissteel\\\/\",\"https:\\\/\\\/nl.linkedin.com\\\/company\\\/ferris-structural-steel\",\"https:\\\/\\\/www.instagram.com\\\/ferrisstructuralsteel\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Yara Carbon Capture and Storage project | 1,000 Ton Steel","description":"Ferris engineered, fabricated and installed over 1,000 tonnes of steel structures for Yara\u2019s Carbon Capture and Storage project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/","og_locale":"en_US","og_type":"article","og_title":"Yara Carbon Capture and Storage project | 1,000 Ton Steel","og_description":"Ferris engineered, fabricated and installed over 1,000 tonnes of steel structures for Yara\u2019s Carbon Capture and Storage project.","og_url":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/","og_site_name":"Ferris","article_publisher":"https:\/\/www.facebook.com\/ferrissteel\/","article_modified_time":"2026-03-12T17:35:46+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Header-Yara-CCS-2000px-1-kopie.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/","url":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/","name":"Yara Carbon Capture and Storage project | 1,000 Ton Steel","isPartOf":{"@id":"https:\/\/ferrissteel.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/#primaryimage"},"image":{"@id":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/#primaryimage"},"thumbnailUrl":"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Header-Yara-CCS-2000px-1-kopie.webp","datePublished":"2025-09-10T11:48:54+00:00","dateModified":"2026-03-12T17:35:46+00:00","description":"Ferris engineered, fabricated and installed over 1,000 tonnes of steel structures for Yara\u2019s Carbon Capture and Storage project.","breadcrumb":{"@id":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/#primaryimage","url":"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Header-Yara-CCS-2000px-1-kopie.webp","contentUrl":"https:\/\/ferrissteel.com\/wp-content\/uploads\/2025\/09\/Header-Yara-CCS-2000px-1-kopie.webp","width":2000,"height":1333,"caption":"Header foto Yara project Carbon capture and storage (CCS)"},{"@type":"BreadcrumbList","@id":"https:\/\/ferrissteel.com\/en\/projects\/yara-carbon-capture-and-storage-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ferrissteel.com\/en\/"},{"@type":"ListItem","position":2,"name":"Projecten","item":"https:\/\/ferrissteel.com\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"Yara Carbon Capture and Storage project"}]},{"@type":"WebSite","@id":"https:\/\/ferrissteel.com\/en\/#website","url":"https:\/\/ferrissteel.com\/en\/","name":"Ferris","description":"Structural steel","publisher":{"@id":"https:\/\/ferrissteel.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferrissteel.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ferrissteel.com\/en\/#organization","name":"Ferris","url":"https:\/\/ferrissteel.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrissteel.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/ferrissteel.com\/wp-content\/uploads\/2024\/09\/Ferris_Logo_DEF.svg","contentUrl":"https:\/\/ferrissteel.com\/wp-content\/uploads\/2024\/09\/Ferris_Logo_DEF.svg","width":1,"height":1,"caption":"Ferris"},"image":{"@id":"https:\/\/ferrissteel.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrissteel\/","https:\/\/nl.linkedin.com\/company\/ferris-structural-steel","https:\/\/www.instagram.com\/ferrisstructuralsteel\/"]}]}},"_links":{"self":[{"href":"https:\/\/ferrissteel.com\/en\/wp-json\/wp\/v2\/project\/5384","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrissteel.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/ferrissteel.com\/en\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":16,"href":"https:\/\/ferrissteel.com\/en\/wp-json\/wp\/v2\/project\/5384\/revisions"}],"predecessor-version":[{"id":5534,"href":"https:\/\/ferrissteel.com\/en\/wp-json\/wp\/v2\/project\/5384\/revisions\/5534"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrissteel.com\/en\/wp-json\/wp\/v2\/media\/5387"}],"wp:attachment":[{"href":"https:\/\/ferrissteel.com\/en\/wp-json\/wp\/v2\/media?parent=5384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ferrissteel.com\/en\/wp-json\/wp\/v2\/categories?post=5384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}