Steel structure and cladding work

Staalconstructie en de beplatings-
werkzaamheden

 

The AVR waste-to-energy plant was hit by a major fire in 2023. As a result, waste treatment and energy supply came to a halt. AVR has now started rebuilding. Reconstruction work soon began under the name Project Phoenix. Phoenix includes a number of major projects, as well as temporary emergency facilities. The biggest project is the new construction of the steam power plant. To that end, Ferris is providing the new Steam Power Plant building with an entire steel structure and all the necessary cladding.

Main structure

Main structure

 

Ferris worked on both the lower part of the new steel structure, as well as on the ‘superstructure’. The latter structure was assembled in several stages. This completes the main structure. We also worked on the stair tower on the east facade. Worth mentioning is the collaboration with fellow contractors and the mutual coordination of work. Good collaboration is key.

Pipe rack structures

Pipe rack structures

 

Concurrently with the work on the Steam Power Plant, Ferris is working on the OSBL (Outside Battery Limits) route at the AVR site, which is also part of the Phoenix project. We are doing this on behalf of Equans. We designed, supplied, and assembled a new pipe rack structure for the new, low-pressure steam pipes running towards the Steam Power Plant. This a stretch of about 160 metres! A major challenge here was fitting part of the pipe rack into the existing, very compact corridor.

The added value of Ferris

The added value of Ferris

 

Working together on demanding steel projects: that’s what gets us hot at Ferris. Our specialisms include plant maintenance, modifying/extending existing steel structures, and co-building new plants. We prove our added value through expertise. We like to help think about challenges and come up with surprising solutions. We are at our best when our entire team is involved: design, manufacturing, and assembly. We find anything that deviates slightly from the standard both challenging and energising. This makes us a good partner for steel structures in environments that require an extra step.

 

Our focus is clear: to realise every construction project as efficiently as possible and with the highest quality. We carry out every job safely, we are flexible and highly reliable. This is what we call constructive collaboration. This is reflected in everything we do; from design to completion and even beyond.

Over Ferris

The Ferris working method

The Ferris working method

Constructive collaboration on steel solutions

 

By this we mean the close collaboration of colleagues among themselves, but also collaboration between departments, with clients, and with suppliers. At Ferris, we are convinced that we need each other to achieve high-quality customisation. We are aware that every step in the steel project counts.

 

We look critically, at ourselves and at each other. We do not compromise on safety or quality and always have a sharp focus on our commitments. We feel responsible. From engineering to manufacturing, assembly, and service & maintenance; together we deliver on the promise of steel solutions.

AVR tijdelijke stroomcentrale staalconstructies 05
shape

Discuss your challenge with our experts

Discuss your challenge with our experts

shape

Discuss your challenge with our experts

Discuss your challenge with our experts

+31 115 644 600 info@ferrissteel.com

Ferris Structural Steel:   Engineering  |  Manufacturing  |  Assembling |

Contact us